Water/Wastewater & Power
Treatment Plants
91st Avenue WWTP UP05 Upgrades, Phoenix AZ – geotechnical investigation & construction materials testing for City of Phoenix UP05 program, a $160M upgrade project to the existing facility.
Tres Rios Rios Ecosystem Restoration & Flood Control Project, Phoenix AZ – construction materials testing for restoration of the wetlands including mass earthwork, soils stabilization, new channels, spillways and flood control structures.
Taliesin West Water Supply Improvements, Scottsdale AZ – geotechnical investigation for new reservoir and pipeline.
Evergreen Waste Water Treatment Plant, Evergreen CO – materials testing and observation services to existing treatment plant improvements.
Pipeline
Jefferson Street Storm Drain, Phoenix AZ – geotechnical investigation and construction materials testing for new storm drain including 14,000 feet of new laterals and 120 new inlets.
SPA2 Pipeline, Surprise AZ – geotechnical investigation and construction materials testing for 9,500 feet of sanitary sewer line.
City of Phoenix Basin N Sewer Relief and Replacement Program, Phoenix AZ – geotechnical investiagation for replacement of over 2 miles of sanitary sewer.
Power
Rainbow Hydro-Electric Redevelopment Project, Great Falls MT – full-time construction observation and testing during reconstruction of the Rainbow Hydro-Electric Dam including access roads, bridges, channels, intake structures, powerhouse, penstocks, substations, etc.
Miscellaneous
Arvada-Blunn Reservoir Enlargement, Arvada CO – materials testing and observation services for modification of an existing dam, spillway and associated structures.
Percolation Testing – stormwater retention and septic disposal systems using falling head and double-ring infiltrometer methods.
More Projects
- Commercial Buildings
- Institutional
- Recreational
- Transportation
- Water/Wastewater & Power